Sutton & London · built by one pair of hands

From timber frame
to somewhere to breathe.

Built by hand, from bare timber frame to finished media wall. Every wall is made to measure, framed, plastered and painted on site by one experienced carpenter with over 23 years on the tools. No subcontractors. No shortcuts. Just one person building the calmest corner of your home.

23+years trade experience
Freesite visit within 50mi of London
Fixedquote before work starts
Built.Calm tradesman holding a Built.Calm mug in front of an unfinished media wall frame, mid-build
Sutton, SM1Mid-build, media wall in progress

Made to your exact wall

Every job starts as a drawing, not a guess.

Before anything is cut, your wall gets measured and set out properly, width, height, recess sizes, all confirmed on site so the finished piece fits like it was always there.

Elevation drawing of a symmetrical media wall design with a central recessed TV and fireplace, shelving either side, and width and height dimensions marked
Elevation A, symmetrical shelving, recessed TV & fire
Elevation drawing of an asymmetric backlit media wall design with stepped shelving either side of a central TV recess, dimensioned
Elevation B, backlit geometric, stepped shelving
Trained carpenter, 23+ years on the tools, fully insured, one tradesman, start to finish
Structural framing, not surface-mounted panels, built into the room
Every job made-to-measure, no two walls are the same size
Site visit fee (if outside 50mi) deducted from your final quote

Who's building it

One tradesman. Every stage. No subbies. I build the wall, you get the calm.

The person who quotes your job is the person on the ladder, and the person you call after, if anything ever needs a second look.

Read my story

How a media wall gets built

Four stages, one tradesman, no gaps in between.

Most fitted-furniture companies hand you a flat panel stuck to the wall. This is different, it's structural, built into the room, from bare timber up.

01

Frame

Timber stud frame built to your exact wall, following the room's true lines, including sloped ceilings or awkward corners.

02

Board & first fix

Plasterboarded with power points, aerial and lighting cabling run through before anything is closed up.

03

Skim & paint

Plastered smooth and finished in your chosen paint, plaster texture, or microcement effect.

04

Reveal

TV, fire and lighting fitted, and your new media wall handed over, usually 7 to 10 working days from start.

See it happen

From bare frame to finished wall.

Drag the slider, this is the same wall, the same job, start to finish.

Bare timber stud frame for a media wall, before boarding The same media wall finished, painted, with recessed TV, lit alcoves and fireplace
Frame
Finished
Drag to compareSutton, SM1, completed job

Recent work

Every wall is a different size, a different room, a different finish.

Where we work

Based in Sutton. Building across London and beyond.

London & the South East

Sutton, Croydon, Wimbledon, Wallington, Cheam, Epsom, Kingston upon Thames and the rest of Greater London are home turf, most jobs here, no travel surcharge.

Further afield

Available UK-wide for larger jobs. Site visits are free within 50 miles of London; outside that, a small call-out fee applies and is deducted from your final quote if you go ahead.

Tell us about your wall, get an estimate back before we ever visit.

Start your quote
Call now Get a quote